Alghanim Engineering team put together the entire low-voltage system for the Al Jazeera Airways Terminal; this included assembling CCTV, Access Control, Public Address, IP Clock, Flight Information Display System, Structured Cabling, Data Active, Wireless Network and Telephony, in addition to the full installation of the Bus Duct system by our Lighting Division.